MSOM
HOME HELP FEEDBACK SUBSCRIPTIONS ARCHIVE SEARCH TABLE OF CONTENTS
 QUICK SEARCH:   [advanced]


     


MANUFACTURING & SERVICE OPERATIONS MANAGEMENT
Vol. 11, No. 1, Winter 2009, pp. 109-127
DOI: 10.1287/msom.1070.0199
This Article
Right arrow Full Text (PDF)
Right arrow References
Right arrow Alert me when this article is cited
Right arrow Alert me if a correction is posted
Services
Right arrow Email this article to a friend
Right arrow Similar articles in this journal
Right arrow Alert me to new issues of the journal
Right arrow Download to citation manager
Right arrow reprints & permissions
Citing Articles
Right arrow Citing Articles via HighWire
Right arrow Citing Articles via Google Scholar
Google Scholar
Right arrow Articles by Swinney, R.
Right arrow Articles by Netessine, S.
Right arrow Search for Related Content

Long-Term Contracts Under the Threat of Supplier Default

Robert Swinney, Serguei Netessine

The Wharton School, University of Pennsylvania, Philadelphia, Pennsylvania 19104
The Wharton School, University of Pennsylvania, Philadelphia, Pennsylvania 19104

rswinney{at}wharton.upenn.edu
netessin{at}wharton.upenn.edu

Contracting with suppliers prone to default is an increasingly common problem in some industries, particularly automotive manufacturing. We model this phenomenon as a two-period contracting game with two identical suppliers, a single buyer, deterministic demand, and uncertain production costs. The suppliers are distressed at the start of the game and do not have access to external sources of capital; hence, revenues from the buyer are crucial in determining whether default occurs. The production cost of each supplier is the sum of two stochastic components: a common term that is identical for both suppliers (representing raw materials costs, design specifications, etc.) and an idiosyncratic term that is unique to a given supplier (representing inherent firm capability). The buyer chooses a supplier and then decides on a single- or two-period contract. Comparing models with and without the possibility of default, we find that, without the possibility of supplier failure, the buyer always prefers short-term contracts over long-term contracts, whereas this preference is typically reversed in the presence of failure. Neither of these contracts coordinates the supply chain. We also consider dynamic contracts, in which the contract price is partially tied to some index representing the common component of production costs (e.g., commodity prices of raw materials such as steel or oil), allowing the buyer to shoulder some of the risk from cost uncertainty. We find that dynamic long-term contracts allow the buyer to coordinate the supply chain in the presence of default risk. We also demonstrate that our results continue to hold under a variety of alternative assumptions, including stochastic demand, allowing the buyer the option of subsidizing a bankrupt supplier via a contingent transfer payment or loan and allowing the buyer to unilaterally renegotiate contracts. We conclude that the possibility of supplier default offers a new reason to prefer long-term contracts over short-term contracts.

Key Words: supply chain management; financial default; contracting; game theory
History: Received: September 2, 2006; accepted: August 13, 2007.




This article has been cited by other articles:


Home page
MSOMHome page
C. Li and L. G. Debo
Second Sourcing vs. Sole Sourcing with Capacity Investment and Asymmetric Information
MSOM, July 1, 2009; 11(3): 448 - 470.
[Abstract] [PDF]




HOME HELP FEEDBACK SUBSCRIPTIONS ARCHIVE SEARCH TABLE OF CONTENTS
Copyright © 2009 by INFORMS.